Global food manufacturer secondary aeration lagoons,2006: partial HTML edition
Edition of the supplied seven-page2006 case study. Source prose and legible chart labels are retained, not independently validated or updated. Read original case study (PDF). Original PDF unchanged. Repeated bio-organic.com furniture is consolidated here. Source-page headings and identified diagram descriptions are editorial. This is a partial transcription: tiny gray chart text on source page 7 remains unreadable. Legible content is included; a clearer source is needed for complete equivalence.
Source page 1
CASE STUDY
Results Of Ecosystems Plus® Injection In Secondary Aeration
Lagoons Global Food Manufacturer (September 6-22 2006)
Primary Project Objectives::
- Demonstrate ESP®’s ability to increase the transfer of dissolved oxygen into the secondary aeration lagoons.
- A baseline of DO measurements was established for the period 8/17-23/06 in both lagoons 2 & 3.
- The levels were measured daily at 5 separate points along the length of each lagoon.
- The points were: 1. Influent distribution box. 2. The beginning of lagoon. 3. Midway point. (Opposite surface aerator #1). 4. End of the lagoon. (Opposite surface aerator #2). 5. Effluent discharge box.
GLOBAL FOOD MANUFACTURER–WWTP ESP INJECTION POINT. Food Manufacturing Discharge flows to an Influent Wet Well (.75 MGD), Flow Equalization Tanks With Mixers, then Anaerobic Bio-Reactors. A gas line connects the reactors to a Bio Gas Boiler and Gas Flare. Liquid flows to two Aeration Lagoons and then Clarifier1 and Clarifier2, before To Chlorine Contact and Discharge. DO Sample Points are #1 at the inlet, #2 near the lagoon beginning, #3 midway, #4 near the end, and #5-Discharge. RAS returns Activated Sludge to the lagoons; WAS goes to Sludge Storage, with Polymer Injection, then To sludge belt press and land application. Aeration Blowers connect to the lagoons. Clarifier Sample Point and Effluent24hr/Day Composite Sample Point are labeled. An EcoSystem Plus drum, Bio-Organic Catalyst Injection Point label and arrow point to the influent wet well in this schematic. This is distinct from the lagoon#3 injection location specified in the trial prose and next page; the original diagram is not altered. The source logo reads BIO-ORGANIC CATALYST, THE POWER IN NATURE®. Small product artwork reads NON-TOXIC AND SAFE and ENVIRONMENTALLY FRIENDLY.
Source page 2
Photograph of a churning brown-water lagoon. Arrows label the Aeration Building and Injection Point in the background; a Flow Direction arrow points toward the foreground/right.
Photograph of aeration equipment and brown lagoon water. Labels identify Flow Equalization Tanks, Anaerobic Bio-Reactor Building, Secondary Clarifiers, and Flow Direction toward the right. Both photographs have a small right-pointing presentation-navigation icon.
Source page 3
Technology breakthrough greater aeration efficiency:
- Improves oxygen transfer and uptake.
- Reduces energy use, while increasing DO.
- Increases biological activity and biomass.
- Increases treatment plant capacity.
- Reduces volatile organics for odor control.
- Improves nitrification and de-nitrification cycle.
Technology breakthrough solubilization of lipids:
- Solubilization of fats, oils, and greases (FOG’s).
- This is an accelerated natural catalytic process in which lipid ester bonds are rapidly cleaved, reducing their molecular structure to both glycerol and fatty acids.
- Glycerol and fatty acids are then readily available to wastewater micro-organisms as a high-energy food source of carbon for enhancement of nitrification and de-nitrification reduction processes.
Study parameters (dissolved oxygen testing):
- Since the RAS could not be separated, it was not possible to isolate Lagoon #3 and #2.
- Increases in DO were examined and compared as a combined total for lagoons #2 and #3.
- The ON and OFF time periods are both compared against the baseline.
Secondary channel flows:
- The average daily influent flow from the anaerobic bio-reactor is .75 MGD, and this flow is split into two (2) influent flows of .365 MGD to the aerobic lagoons #2 and #3.
- These secondary aeration lagoons have a volume of 1.5 million gallons each.
- Each aeration lagoon has two (2) surface aerators, along with six 6 sub-surface, finebubble, air diffusers.
Secondary channel loading:
- Average return activated sludge (RAS) flow, per-lagoon, is .144 MGD.
- Baseline average daily loading was 10,677 lbs. TCOD.
- Average daily loading during study (9/6-22/06) was 14,818 lbs. TCOD.
Study Start-up:
- EcoSystems Plus® was injected into the #3 lagoon influent distribution box: 9/6-22/06 @ 3.6 GPD.
- The results of increased DO levels (9/6-22/06) are compared against various baselines.
Study testing:
- NH3-N and TCOD levels, sampled at the clarifier discharge point, were compared against historic baselines.
- Final sludge volumes from dewatering were compared against a baseline.
- PO4-P Removal Rates were compared as well.
Results in secondary aeration lagoons (dissolved oxygen)
- 45% increase in DO measured at the lagoon discharge point: study period 9/6-22/06, against baseline period 8/17-23/06.
- Surface aerators both on and off.
- Concurrent with 39% increase in TCOD loading, over baselines.
Results in secondary aeration lagoons (dissolved oxygen):
- 70% increase in DO measured at the lagoon discharge point with ESP injection, against the baseline period.
- Surface aerators continually on.
- Concurrent with 39% increase in TCOD loading.
Source page 4
Comparison of total (DO) increases in secondary aerators:
Legend distinguishes AVER Lagoon Loading Lbs of TCOD8/17-23/06 and9/6-22/06; Baseline DO Levels8/17-23/06; Combined With ESP Inj.9/6-22/06. The left axis Lbs of TCOD LOADING runs9000–16000 in1000 increments; the right DO mg/L axis runs0.2–1.2 in0.1 increments. Loading bars are labeled10,677 and14,818. Annotation: DO Increased45% Over Baseline, In spite of39% Increase in Lbs of TCOD. The full printed line labels follow.
| Location | Baseline DO (mg/L) | With ESP DO (mg/L) |
|---|---|---|
| Combined Lagoon 2&3 Header Box | 0.35 | 0.26 |
| Combined Stage 1 | 0.49 | 0.69 |
| Combined Stage 2 | 0.51 | 0.83 |
| Combined Stage 3 | 0.89 | 0.71 |
| Combined Discharge Box | 0.75 | 1.10 |
Comparison of (DO) increases with all surface aerators on:
Source legend: Baseline DO Levels 8/17-23/06; Aver 9/6-14 All Aerators On. Vertical axis DO mg/L, 0.2–1.4 in steps of0.2. Source annotation: DO Increased70% Over baseline. Values below are printed labels, not inferred bar heights.
| Location | Baseline DO (mg/L) | With ESP DO (mg/L) |
|---|---|---|
| Combined Lagoon 2&3 Header Box | 0.35 | 0.27 |
| Combined Stage 1 | 0.49 | 0.77 |
| Combined Stage 2 | 0.51 | 1.12 |
| Combined Stage 3 | 0.89 | 1.01 |
| Combined Discharge Box | 0.75 | 1.28 |
Source page 5
Comparison of (DO) increases with all surface aerators on:
Source legend: Baseline DO Levels 8/17-23/06; Aver 9/6-14 All Aerators On. Vertical axis DO mg/L, 0.2–1.4 in steps of0.2. Source annotation: DO Increased70% Over baseline. Values below are printed labels, not inferred bar heights.
| Location | Baseline DO (mg/L) | With ESP DO (mg/L) |
|---|---|---|
| Combined Lagoon 2&3 Header Box | 0.35 | 0.27 |
| Combined Stage 1 | 0.49 | 0.77 |
| Combined Stage 2 | 0.51 | 1.12 |
| Combined Stage 3 | 0.89 | 1.01 |
| Combined Discharge Box | 0.75 | 1.28 |
Secondary aeration Lagoons (NH3, TKN & TCOD Reductions):
- 69.3 % reduction in NH3 & TKN- (mg/l) @ clarifier discharge.
- 36.2% reduction in TCOD -(mg/l) @ clarifier discharge.
Reductions of NH3 - N at clarifier:
Vertical axis NH3-N mg/L,0–9 in steps of0.5; daily categories9/6/06 through9/30/06 with ESP AVER INJ. PERIOD between9/22 and9/23. Printed baseline bar:6.35; ESP average injection-period bar:1.95. Annotations: ESP Inj Starts9/6 @3:30pm; ESP Inj Ends9/22; NH3-N AVER With ESP Inj. Reduced69.3%. A dashed baseline crosses the plot near6.35. The daily bars rise above baseline on9/7, then remain below baseline through the rest of the plotted dates. Unlabeled individual bar heights are not assigned invented values.
Source page 6
Reductions in TCOD at clarifier:
Vertical axis TCOD mg/L,0–80 in steps of10; daily categories09/06/06 through09/29/06 with ESP AVER INJ. PERIOD between09/22 and09/23. Printed baseline bar58; printed ESP injection-period average37. Annotations: ESP Inj. Starts9/6; ESP Inj. Ends9/22; Aver TCOD Reduction Of36.2% With ESP INJECTION. The daily bars vary, with a high bar near70 on09/11; the remaining daily bars are below the baseline. Unlabeled bar heights are not transcribed as exact values.
Secondary aeration lagoons (TKN, NH3-N & nitrates) reductions in final discharge levels:
- 68.6% in TKN mg/l @ Effluent discharge
- 85.7% in Ammonia as NH-3 mg/l @ Effluent discharge
- 83.3 % in Nitrate as N mg/l @ Effluent discharge
Improved final effluent discharges:
Vertical axis mg/L,0–5.5 in0.5 increments. Legend:24hr.comp.TKN mg/l; Ammonia as N mg/l; nitrate as N mg/l. Annotations: REDUCTION WITH ESP INJECTION68.6% in TKN,85.7% in Ammonia as N,83.3% in Nitrate as N; Continued “Carry Over Effect” Of ESP at10/4. Values below are the labels printed in this chart, including the source average category as shown.
| Category | TKN mg/l | Ammonia as N mg/l | Nitrate as N mg/l |
|---|---|---|---|
| 60 day Baseline Aver | 5.1 | 1.4 | 0.3 |
| 9/6 | 4.8 | 1.80 | 0.26 |
| 9/13 | 3.8 | 0.40 | 0.53 |
| 9/20 | 1.6 | 0.10 | 0.05 |
| Aver-With ESP Inj. | 3.4 | 0.8 | 0.3 |
| 10/4 | 1.5 | 0.10 | 0.39 |
Source page 7
Improvements in PO4-P discharges:
- Baseline PO4-P % removal was 89.6 %
- Removal rates improved to 97.3 % for three weeks.
- One week (9/20/06) only improved by .3 %, however the influent load increased by 14% during that week.
Improved removal of PO4-P discharges (influent vs effluent):
Vertical axis % Removal of Influent vs. Effluent Discharge PO4-P,88.0–98.0 in1.0 increments. A dashed line marks the89.6 baseline. Annotations: .3% Increase in % removal rate, In spite of a14% increase of Influent Loading;8% Increase In Removal Rate with ESP “Carry Over Effect”. Printed values follow. Tiny gray text inside the baseline and average outlined bars is not legible at the supplied image resolution and has not been guessed; the original PDF retains it.
| Category | Removal (%) |
|---|---|
| 60 day-Baseline Aver | 89.6 |
| 9/6/2006 | 89.3 |
| 9/13/2006 | 97.2 |
| 9/20/2006 | 89.9 |
| 9/27/2006 | 97.5 |
| Aver With ESP Inj | 93.4 |
| 10/4/2006 | 97.4 |
Reductions in sludge volumes:
- 28.3 % Sludge reduction
- Baseline level of sludge pressed: daily average of 57,065 Lbs.
- Study period sludge pressed: daily average of 40,892 Lbs.
- Concurrent during study period there was a 39% increase in Lbs. of TCOD influent loading.